引用本文:
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览次   下载 本文二维码信息
码上扫一扫!
分享到: 微信 更多
连续油管带筛管双重管柱岩屑运移模型研究
杨睿月,黄中伟,李根生,沈忠厚,韩树,许争鸣
(中国石油大学油气资源与探测国家重点实验室,北京 102249)
摘要:
连续油管带筛管喷射侧钻多分支井钻完井一体化是一种新型的多分支井钻井方法,针对本技术连续油管和筛管所形成的双重管柱,开展岩屑运移试验研究,采用Monte Carlo方法预测岩屑颗粒进入割缝筛管与连续油管之间环空的情况,并计算环空中被岩屑颗粒堵塞的临界参数。结果表明:双重管柱岩屑运移存在悬浮层、跃移层、静止岩屑层以及筛管与连续油管之间的砂堵层。由于具有更小的环空过流面积,双重管柱的岩屑运移能力比常规连续油管钻井高。试验条件下,砂堵层不发生堵塞的临界条件是:当缝宽介于岩屑颗粒之间时,泵排量高于0.98 L/s,或机械钻速小于40.09 km/h,缝宽比岩屑粒径越大,临界机械钻速越小;当缝宽大于岩屑颗粒直径时,泵排量高于0.88 L/s或机械钻速小于5.74 km/h。
关键词:  多分支井  连续油管  割缝筛管  岩屑运移  蒙特卡洛方法
DOI:10.3969/j.issn.1673-5005.2016.05.010
分类号::TE 21
文献标识码:A
基金项目:国家科技重大专项(2011ZX05037-001)
Slotted liner sheathing coiled tubing—a dual-pipe model for cuttings transport
YANG Ruiyue, HUANG Zhongwei, LI Gensheng, SHEN Zhonghou, HAN Shu, XU Zhengming
(State Key Laboratory of Petroleum Resources and Prospecting in China University of Petroleum, Beijing 102249, China)
Abstract:
Drilling with slotted liner sheathing coiled tubing (SLSCT) is a new technique for multilateral jetting, which is designed to synchronize the jet drilling and liner tube running in one trip. Its drilling assembly includes dual-pipes, thus the cuttings transport efficiency in a dual-pipe mode needs special analysis. In this study, laboratory experiments were conducted to investigate the cuttings transport mechanisms in a dual-pipe system. A Monte Carlo algorithm was proposed to determine the amounts of cuttings entering the annulus between the coiled tubing and slotted liner, and it was also used to estimate the critical pumping rate and drilling rate for the case of cutting blocking. A four-layer model for cuttings transport with the SLSCT multilateral jetting was established, including suspension layer, moving bed layer, stationary layer and cutting blocking layer, which exist in the annulus between the coiled tubing and slotted liner. The cuttings carrying capability of a dual-pipe system is higher than that of the conventional coiled tubing drilling due to the smaller flow area thus the higher annular pumping velocity. Under the experiment conditions of this research, the critical condition for no cutting blocking is that, in the case the slot size smaller than the cutting particle size, the pumping rate is higher than 0.98 L/s, or the ROP is smaller than 40.09 km/h, and the wider the slot size, the lower the ROP. In the case of the slot size larger than the cutting particle size, the pumping rate is recommended to be higher than 0.88 L/s, or the ROP is smaller than 5.74 km/h.
Key words:  multilateral well  coiled tubing  slotted liner  cuttings transport  Monte Carlo method
版权所有 中国石油大学学报(自然科学版)编辑部 Copyright©2008 All Rights Reserved
主管单位:中华人民共和国教育部 主办单位:中国石油大学(华东)
地址: 青岛市黄岛区长江西路66号中国石油大学期刊社 邮编:266580 电话:0532-86983553 E-mail: journal@upc.edu.cn
本系统由:北京勤云科技发展有限公司设计