引用本文:
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览次   下载 本文二维码信息
码上扫一扫!
分享到: 微信 更多
控压钻井井控过程中排量优化设计
何淼1,柳贡慧1,2,李军1,熊超3,游子卫4
(1.中国石油大学石油工程学院,北京 102249;2.北京工业大学,北京 100124;3.新疆油田公司工程技术研究院,新疆克拉玛依 834000;4.华北油田采油工程研究院,河北任丘 062552)
摘要:
控压钻井井控是处理气侵溢流问题的有效新方法,包括前期控制和循环排气两个阶段。基于快速施加井口回压控制方法,根据气液固多相流理论,建立控压钻井井控数学模型,并采用有限差分法迭代求解。在此基础上,分析排量对最大井口回压、最大套管鞋处压力和最大立管压力的影响,并提出基于井控安全目标函数的排量优化设计方法。模拟结果表明:在循环排气阶段,立管压力维持不变且为最大值,井口回压达到最大值与气体前沿运移到井口之间存在明显的时间滞后性,气体运移到套管鞋处时套管鞋处压力最大;验证了以出入口流量一致表征井底气侵停止的合理性。模型计算得到的压力值与实验测量值吻合较好。
关键词:  控压钻井  井控  井口回压  循环排气  井控安全  排量优化
DOI:10.3969/j.issn.1673-5005.2016.04.012
分类号::TE 242
文献标识码:A
基金项目:国家自然科学基金项目(51334003,51274221,51274045,51374223)
Optimization of pumping rate for well control during managed pressure drilling
HE Miao1, LIU Gonghui1,2, LI Jun1, XIONG Chao3, YOU Ziwei4
(1.College of Petroleum Engineering in China University of Petroleum, Beijing 102249, China;2.Beijing University of Technology, Beijing 100124, China;3.Research Institute of Engineering Technology of Xinjiang Oilfield, Karamay 834000, China;4.Research Institute of Petroleum Production Engineering of Huabei Oilfield, Renqiu 062552, China)
Abstract:
Well control via managed pressure drilling (MPD) is a new and effective method to deal with gas kicks and overflow problems, which includes two stages:initial control response and circulating out of gases. According to the gas-liquid-solid multiphase flow theory, a MPD well control model based on rapidly applying wellhead back pressure method was established, and a finite difference method was used to iteratively solve the model. The effects of pumping rate on the maximum wellhead back pressure, maximum casing shoe pressure and maximum standpipe pressure were analyzed using the model, and an optimized design method for the pumping rate as the objective function for well control safety was proposed. The simulation results show that, in the stage of gas circulating out, the standpipe pressure remains unchanged with its maximum value, and the peak value of the wellhead back pressure appears before the gas front migrates to the wellhead, while the maximum value of the casing shoe pressure appears when the gas front migrates to the casing shoe. The reasonability of using the consistence of outlet flow and inlet flow to indicate the stoppage of bottom hole influx can be verified using the model. The calculated pressure values using the model agree well with the experimental results.
Key words:  managed pressure drilling  well control  wellhead back pressure  circulating out of gas  well control safety  pumping rate optimization
版权所有 中国石油大学学报(自然科学版)编辑部 Copyright©2008 All Rights Reserved
主管单位:中华人民共和国教育部 主办单位:中国石油大学(华东)
地址: 青岛市黄岛区长江西路66号中国石油大学期刊社 邮编:266580 电话:0532-86983553 E-mail: journal@upc.edu.cn
本系统由:北京勤云科技发展有限公司设计